Rs 56 lakhs or Rs 65 lakhs? Why the portals and the price sheet disagree
This site quotes Rs 56 lakhs, the portals quote Rs 65 lakhs, and nobody has raised the price. The gap is other charges, GST and Karnataka statutory, worked through rupee by rupee.
Search for this project and you will be quoted two different starting prices. This site says Rs 56 lakhs. Most property portals say Rs 65 lakhs. Neither is wrong, nobody has raised the price, and the gap is entirely explainable.
It is worth understanding properly, because the same confusion runs through all six configurations, and because a buyer who budgets from the lower number and signs against the higher one is short by about nine lakhs on the entry home.
The two ladders
| Home | Base price, on the tower sheets | All in, as portals quote it |
|---|---|---|
| 1 BHK | Rs 56 L | Rs 65 L |
| 2 BHK | Rs 82 L | Rs 90 L |
| 2 BHK large | Rs 1.02 Cr | Rs 1.15 Cr |
| 3 BHK 2T | Rs 1.32 Cr | Rs 1.50 Cr |
| 3 BHK 3T | Rs 1.46 Cr | Rs 1.69 Cr |
| 3 BHK 3T large | Rs 1.64 Cr | Rs 1.89 Cr |
Two things give the game away. The gap is roughly proportional across all six rows, which a price revision would not be. And the Rs 65 lakh figure was already in circulation on 21 September, four days before the project opened for booking on 25 September. A number that existed before the launch cannot be a post launch increase.
Closing the gap, line by line
The base price on the tower sheet is inclusive of the carpark and the floor rise, and exclusive of everything else. Take the entry 1 BHK at 567 sq ft and add what the sheets themselves say falls due.
| Component | Basis | Amount |
|---|---|---|
| Base price | Tower sheet, including carpark and floor rise | Rs 56,00,000 |
| Other charges | Rs 415 per sq ft on 567 sq ft, plus Rs 25,000 assessment | Rs 2,60,305 |
| GST | 5 per cent, no input credit | Rs 2,93,015 |
| Stamp duty | 5 per cent | Rs 2,80,000 |
| Municipal cess | 0.5 per cent | Rs 28,000 |
| Registration | 2 per cent, raised from 1 per cent on 31 August 2025 | Rs 1,12,000 |
| Total | What actually leaves your account | Rs 65,73,320 |
Rs 65.7 lakhs. The portals say Rs 65 lakhs. That is the answer: the higher ladder is the base price plus other charges, plus GST, plus the 7.5 per cent Karnataka statutory outlay.
Run the same arithmetic across the rest of the sheet and it holds:
| Home | Base | Computed all in | Portal figure | Difference |
|---|---|---|---|---|
| 1 BHK | Rs 56.0 L | Rs 65.7 L | Rs 65 L | 1.1% |
| 2 BHK | Rs 82.0 L | Rs 96.1 L | Rs 90 L | 6.8% |
| 2 BHK large | Rs 1.02 Cr | Rs 1.20 Cr | Rs 1.15 Cr | 4.1% |
| 3 BHK 2T | Rs 1.32 Cr | Rs 1.55 Cr | Rs 1.50 Cr | 3.4% |
| 3 BHK 3T | Rs 1.46 Cr | Rs 1.71 Cr | Rs 1.69 Cr | 1.5% |
| 3 BHK 3T large | Rs 1.64 Cr | Rs 1.92 Cr | Rs 1.89 Cr | 1.8% |
Every row lands within seven per cent, most within two. The residual is explained by rounding and by which floor band the portal picked: the sheets price each code across several bands, so an all in figure computed on the lowest band will sit slightly under one computed on a middle band.
Our own figures are derived from the nine tower price sheets rather than from a rounded fact sheet number, and the full component breakdown is on the cost sheet page.
Which number should you actually use
Budget on the all in figure. Negotiate on the base.
The base price is the only part anyone has discretion over, so it is the number that matters in a conversation with a sales manager. The all in figure is the number that matters to your bank, your savings and your spouse, because it is what the purchase actually costs before you have bought a single light fitting.
Two practical consequences follow.
Your loan is sized on the agreement value, not on the all in figure. A lender funds a percentage of the agreement value. GST, stamp duty, registration and in most cases the other charges are yours in cash. On the entry 1 BHK that is roughly Rs 7.1 lakhs of cash on top of your down payment, and it falls due at points you do not choose. What a lender will and will not fund is set out in the home loan piece.
Comparisons between projects are only valid on the same basis. If you are weighing this against Birla Trimaya or Godrej MSR City, check whether the figure you have been given for each is a base price or an all in price. A project quoting all in will look expensive against one quoting base, and the difference is about seventeen per cent of nothing at all. The three way comparison uses base figures throughout for exactly this reason.
The third set of numbers, and why to ignore them
A handful of pages quote neither ladder. We have seen Rs 70 to 75 lakhs for the 1 BHK, Rs 74 lakhs, and one page carrying Rs 65 lakhs in its headline and Rs 74 lakhs in its own summary box. Those are not a third basis; they are pages that have not been updated since before the RERA registration, or that are quoting a mid floor unit as if it were the entry.
The test is simple. Ask which floor band, which tower and which unit code the figure is against. Any price on this project that does not name a unit code and a floor band is a rounded approximation of something, and usually of a different home than the one you are being shown. There are thirty five layouts here and the sheets price each across several bands, which is why a single number can only ever be a starting point.
One thing that has changed since launch
The nine tower sheets were marked prices valid till 27 September 2026. That window closed more than two weeks ago, and as at 17 October 2026 no revised sheet has been published, here or anywhere public. With the project filed at 62.9 per cent booked on 15 October 2026, a revision upward is plausible rather than certain.
So the practical instruction is unchanged but more urgent: get a current, dated price sheet in writing before you budget from any figure on this page or any other.
Related: what the all inclusive price actually covers, and what is still available.
Questions people ask
Why do some sites say Prestige Parklane starts at Rs 56 lakhs and others say Rs 65 lakhs?
Because they are quoting the same price on different bases. Rs 56 lakhs is the base price printed on the tower sheets for a 567 sq ft 1 Bed Classic, inclusive of the carpark and the floor rise. Rs 65 lakhs is roughly what the same home costs after other charges of Rs 415 per sq ft plus Rs 25,000, GST at 5 per cent, and the Karnataka statutory outlay of 7.5 per cent. Computed in full it comes to Rs 65.7 lakhs. Neither figure is a price increase.
What is the actual all in cost of a 1 BHK at Prestige Parklane?
About Rs 65.7 lakhs on the entry layout: Rs 56,00,000 base, Rs 2,60,305 other charges, Rs 2,93,015 GST, Rs 2,80,000 stamp duty, Rs 28,000 municipal cess and Rs 1,12,000 registration. That excludes the kitchen counter and dado, which the specification states are not provided, and any interior work.
Has Prestige Parklane raised its prices since launch?
No published revision has been found as at 13 October 2026. The nine tower sheets carry a validity date of 27 September 2026 and no replacement sheet has been issued publicly. The Rs 65 lakh figure that appears on property portals predates the 25 September launch, so it is not evidence of an increase. Ask for a current dated sheet before assuming either way.
How much cash do I need beyond the home loan at Prestige Parklane?
Roughly Rs 7.1 lakhs on the entry 1 BHK, over and above your down payment. A lender sizes the loan on the agreement value, so GST, stamp duty, registration and generally the other charges come from your own funds. On the larger three bedroom homes the same components run to well over Rs 25 lakhs.
Which price should I use to compare Prestige Parklane with other projects?
Whichever basis you can get for both, as long as it is the same one. Comparing a base price here against an all in price elsewhere will overstate the difference by roughly seventeen per cent. Ask each sales team whether their figure includes the carpark, the floor rise, other charges, GST and statutory, and write the answer down.
Why do some pages quote Rs 70 to 75 lakhs for the Prestige Parklane 1 BHK?
Those are generally stale pages written before the RERA registration and the launch sheets, or pages quoting a mid floor unit as though it were the entry. One page we checked carries Rs 65 lakhs in its headline and Rs 74 lakhs in its own summary box. Any price that does not name a unit code and a floor band is an approximation of an unspecified home.